2334 Stonebridge Circle, Unit D
West Bend, WI 53095
800-766-9918
8a •MBE • WBE • DBE • SBC • EBE
Home About Us Projects Safety News Careers Links Contact Us
VA Radiology
VA Medical Center
USDA Lab Hood Exhaust
Ft McCoy Headworks Bldg
Great Lakes Navy HVAC Renovations Bldg 523
Amtrak
Mauthe Lake
Waukesha Fire Station
Harley Davidson
Potawatomi Casino
Federal Courthouse
Parklawn Assembly of God
Replacement of Fine Screen System at the Headworks Building Ft McCoy, WI, Department of the Army

Building addition and equipment upgrade for the Headworks Building at the Waste Water Treatment Plant at Fort McCoy. The project consisted of the installation of a JWC Muffin Monster Fine Screen System and Muffin Monster Mini-Washer, (1) 7.5-Ton Make-Up Air unit, (1) 300 CFM exhaust fan, relocation of (4) existing exhaust fans, addition of 2,000 square feet of new building space, relocation of existing yard hydrant, demolition of existing hose bib, new electrical and fire alarm, relocation of all existing equipment controls, epoxy paint floor and walls, removal of existing trees, new and relocate sidewalk, and seeding of disturbed grass areas.

Construction Completed: 2007

Licensed • Bonded • Insured • Unionized • Certified • Safety Program
Confined Space Entry Program • EPA Reclamation Program
Quality Control Program • “TQM” Total Quality Management
Army Corps of Engineers Quality in Construction Management